The commercial complex, including commercial and office facilities, covers an area of 37,000 square meters and has a total construction area of 235,000 square meters.
There are three refrigeration rooms, each with two chillers. Tracer automatic control system is used, and the air conditioning water pumps are equipped with inverters. BIGBIC Intelligent provides energy optimization solutions for the three refrigeration rooms at the same time through AI BRAIN solution.
“The average savings rate is over 13.5%”
Comments